Dominican University - Irrigation Project

Natural Resource Savings through DRF's Resource Conservation Solutions Program 30 acre University Campus in River Forest, IL

620,549 Lives Improved
Yes, we work with water heaters, assessments, etc. But we have a larger cause. LEARN MORE >

Multi-phase project yielding potable water savings up to 6 million gallons annually

DU Campus BldgDRF conducted a multi-phase project over two years to eliminate non-essential potable water use.

The project cost $123,225. The payback period was less than one year. DRF estimated the annual potable water savings to be 4-6 million gallons.

The original goal was to get a well on campus that would eliminate the use and purchase of domestic water for irrigation of grass areas and a soccer field. Further research exposed the need for cooling tower makeup water as well, and the difficult task of bringing in a well large enough for the job.

A campus walk brought the team to an 80,000 gallon cistern which was ultimately reclaimed for capture of rain & ground water. A water level control system was installed in the cistern to achieve automatic well operation. A new pressure controlled pump station, replenishment well and supply lines completed the new highly efficient irrigation system, eliminating potable water use for irrigation and cooling tower makeup water.